Home Page

ARMO-LINE: Management of construction projects and projects connected with comprehensive equipping of buildings with engineering systems

ARMO-LINE has implemented a great number of projects, among which there are the network banks and companies' office premises constructed, the retail & entertainment centers, office & warehouse premises fitted out, and also the hotel complexes equipped with engineering systems. As part of the implemented projects, the company conducted technical audits of the buildings, analyzed the Client’s requirements, performed design, installation and commissioning of both the stand-alone engineering systems and the building life support systems integrated through a single intelligent building management system.

The high professional level of ARMO-LINE employees, their knowledge of a wide range of engineering systems and ability to integrate those systems into a single complex allows the company to implement projects with high level of complexity. For example, at different facilities ARMO-LINE employees executed the works related to installation of power supply, lighting, ventilation, air conditioning, water supply, heating, sewerage, security, communications systems, computer, telecommunications and TV broadcasting networks, the operation of which is monitored, controlled and managed by a single intelligent Building Management System.

The list of the projects, during the implementation of which ARMO-LINE equipped the buildings with various engineering systems, is presented below.

Otkrytie Arena Stadium

Construction of the Otkrytie Arena football stadium is dated for preparation for and holding of events of the 2018 FIFA World Cup. Commissioning of the new modern 44,000-seats sports center in Tushino district will take place in 2014.
Executed works:
Revision of the detailed design, supply and installation of equipment, and commissioning of the electrical and low voltage systems.

GoodZone - Multi-purpose Retail & Entertainment Complex

New GoodZone shopping and entertainment center is located in the south of Moscow at the intersection of Kashirskoye and Varshavskoye highways. The total floor area of 145 thousand sq. Meters will include 3 floors of stores, restaurants, multiplex movie theater, bowling and chiuldren’s entertainment center, as well as 2 levels of underground parking.
Executed works:
Design works (Detailed Design stage), supply of equipment, installation and commissioning of all internal engineering systems.

Integrated security system for Kaspersky Lab Office

Kaspersky Lab is headquarted in Moscow, in Olympia Park class “A” business park which covers the total area of 70,000 sq m including 45,000 sq m of office space and a 25,000 sq m parking area.
Executed works:
Implementation of integrated security system for the company head office with capabilities of centralized control of sub-systems at geographically distributed sites.

The EXIAR office building in Moscow

The Agency's office premises are housed in the building with a total area of about 3,000 sq. m. located in the very center of Moscow.
Executed works:
ARMO-LINE performed the project connected with the reconstruction of engineering systems, included designing, dismantling of obsolete equipment and delivery of new one, installation, commissioning and putting into service of the following engineering systems: power supply, air conditioning, automation and dispatching, fire protection and security systems.

ROSBANK Central Office

The ROSBANK Central Office is located in one of three buildings of a modern 'A' class business center - 'Domnikov' on Academica Sakharova Prospect.
Executed works:
Design, supply of equipment, installation, integration and commissioning of the security and fire protection systems installed in the central office building and branches; and also service, warranty maintenance, and extension of the systems.

OTP Bank branches and cash machines network

43 branches of OTP Bank in 34 cities of Russia, 50 cash machines
Executed works:
During the project implementation ARMO-LINE elaborated the systems design (Detailed Design stage), performed delivery, installation and commissioning of the equipment required for the bank security system. At the same time, CCTV, access control and fire alarm systems were integrated into a single complex system. In addition, ARMO-LINE provides warranty service and maintenance of those systems and the expansion thereof if necessary.

“M5-Mall” Retail and Entertainment Complex, Ryazan

Retail and Entertainment Complex, located on the highways intersection - Moscow-Chelyabinsk Federal Highway and Ryazan circumurban road.
Executed works:
Within the project framework, ARMO-LINE Company specialists prepared preliminary design of building engineering systems and “Project” stage documentation. Company professionals designed two gas heating systems both for Retail Complex and adjacent buildings and also prepared working documentation (“WD” stage) for electrical and lighting systems, water supply and sanitation, security systems and structured office and telephone cabling systems. At present, ARMO-LINE started construction and installation operations at the facility.

Novolipetsk Steel: unique integration of access control, video and HR management systems

Novolipetsk Steel occupies the area of over 74 acres; every day over 30 thousand people work at the enterprise with round-the-clock three-shift operation.
Executed works:
Implementation of access control and video surveillance systems at the main entrance to the enterprise management building, and its integration with the existing HR management system. The access control system capacity is 5 thousand people with database expandable to over 50 thousand users.

Warehouse terminal of the Avto-49 car accessories store chain

Warehouse terminal consisting of two detached buildings: the main warehouse and cold store. The buildings are located at an industrial area of Khimki district, Moscow region.
Executed works:
Elaboration of design documentation (Detailed Design stage), delivery and installation of equipment for the integrated security system, including video surveillance, perimeter defense, access control, security alarm systems, and the IT infrastructure along with SCS and LAN networks, WiFi and IP telephony. 500 working places were connected to a computer network at the object. The systems combined by means of software module have centralized management. It is planned to create the unified information space containing the Avto-49 store chain and suppliers.

«Sheraton-Palace» Hotel building in Moscow

«Sheraton-Palace» Hotel, Moscow – 10-story building (8 overground and 2 underground floors) containing 212 rooms, including 21 suites. The Hotel is situated at Tverskaya-Yamskaya, the capital’s main street, in 15 minutes walk from the Garden Ring.
Executed works:
Elaboration of design documentation (Detailed Design stage), delivery of equipment, installation, integration and commissioning of engineering and safety systems, including water supply and sewerage, power supply and electric lighting, ventilation, conditioning and heating, access control, security video surveillance, fire alarm, fire warning and fire fighting systems, SCS, LAN, PBX. The dispatching system is integrated with the Hotel management system computer software.

Pages: 1 | 2

Search / Site map


12 Dvintsev St., bld.1, entrance B
Moscow, Russia, 127018
Phone: (495) 787-33-36/37
Fax: (495) 787-33-40

ARMO Group of Companies

Rambler's Top100
Website creation E.Soft Copyright ARMO-Line 2008-2018